X3 WORKPLACE SAFETYSample dashboard · illustrative data · sign in to save your work
X3 Equipment
X3 Equipment
● Sample data·Pre-use check on record·Defects carried to a decision·An authorized person releases·
X3 Fleet Safety

X3 EquipmentStep 03 · Control

Overview

What is cleared to run, what is on hold and which checks were missed this shift.

Showing
All three sample sites
Sample date
Oct 12, 2026
Checks Done This Week92%196 of 214 required
Critical Fixed Same Shift40%2 of 5 in six weeks

24 assets on the register · Days shift

Every Asset, Right Now

15 cleared to run4 no check this shift1 on hold1 restricted3 not in use

Pick an asset to see what a scan at the machine would show. Cleared to run means in service, with a pre-use check on record for this shift.

4 assets in use with no pre-use check

Missed This Shift

Regulation: 29 CFR 1910.178(q)(7)
  • RT-04 · Reach Truck 04High-Bay Racking, Riverside DC · Keisha Monroe · last checked Oct 11, 6:21 AM
  • SL-01 · Scissor Lift 01Maintenance Shop, North Plant · Owen Kowalski · last checked Oct 11, 6:52 AM
  • PB-04 · Press Brake 04Press Line, North Plant · Marcus Bell · last checked Oct 11, 10:09 PM
  • LD-R1 · Extension Ladder R1Pick Mezzanine, Riverside DC · Aaliyah Brooks · last checked Oct 10, 6:19 AM

The truck rule asks for the exam before a truck is placed in service, at least daily. This site holds every asset on the register to the same habit.

6 items

Needs a Person Today

16 open defects

Open Defects by Age

  • 0 to 1 days4
  • 2 to 7 days6
  • 8 to 30 days4
  • Over 30 days2

A defect stays open until the same line passes at a later pre-use check. 76 hours is the mean time from found to repaired over the last six weeks.

Last 7 days, done out of required

Checks Done by Shift

  • Riverside DC Nights31 of 40 required78%
  • North Plant Nights21 of 23 required91%
  • North Plant Days49 of 53 required92%
  • West Works Afternoons11 of 12 required92%
  • Riverside DC Days49 of 51 required96%
  • North Plant Afternoons6 of 6 required100%
  • West Works Days29 of 29 required100%

Riverside DC Nights is the weak spot: 31 of 40 required checks were done.

This month

Availability by Site

North Plant: 0 hours out of service100%
Riverside DC: 30 hours out of service98.1%
West Works: 0 hours out of service100%

Availability = scheduled hours less out-of-service hours, over scheduled hours. Scheduled is eight hours for every shift an asset is crewed on.

What You Can Do Here

Where This Work Goes Next