X3 Equipment·Step 03 · Control
Overview
What is cleared to run, what is on hold and which checks were missed this shift.
24 assets on the register · Days shift
Every Asset, Right Now
Pick an asset to see what a scan at the machine would show. Cleared to run means in service, with a pre-use check on record for this shift.
4 assets in use with no pre-use check
Missed This Shift
- RT-04 · Reach Truck 04High-Bay Racking, Riverside DC · Keisha Monroe · last checked Oct 11, 6:21 AM
- SL-01 · Scissor Lift 01Maintenance Shop, North Plant · Owen Kowalski · last checked Oct 11, 6:52 AM
- PB-04 · Press Brake 04Press Line, North Plant · Marcus Bell · last checked Oct 11, 10:09 PM
- LD-R1 · Extension Ladder R1Pick Mezzanine, Riverside DC · Aaliyah Brooks · last checked Oct 10, 6:19 AM
The truck rule asks for the exam before a truck is placed in service, at least daily. This site holds every asset on the register to the same habit.
6 items
Needs a Person Today
16 open defects
Open Defects by Age
- 0 to 1 days4
- 2 to 7 days6
- 8 to 30 days4
- Over 30 days2
A defect stays open until the same line passes at a later pre-use check. 76 hours is the mean time from found to repaired over the last six weeks.
Last 7 days, done out of required
Checks Done by Shift
Riverside DC Nights is the weak spot: 31 of 40 required checks were done.
This month
Availability by Site
Availability = scheduled hours less out-of-service hours, over scheduled hours. Scheduled is eight hours for every shift an asset is crewed on.
